O’Brien MWRDGC

Develop design basis (flows and loads): Review and analysis of historical data and special sampling data to estimate future design flow and load conditions for the O’Brien WRP. Uncertainty in data was reduced by statistical analysis to establish trends in Raw (domestic/commercial, industrial) and TARP sewage flows and loads.

Download Brochure
The Project Details

Kaletech assisted with the feasibility report for the nutrient removal facilities upgrade. The facilities plan included an evaluation of future nutrient removal requirements for nitrogen and phosphorus and appropriate technologies for implementation. Preliminary conceptual designs were developed including the order-of-magnitude costs.

Location Skokie, Illinois
Project Type Feasibility Study
Industry Waste Water Service
Client Black & Veatch Corporation
Transportation
analysis.
Civil Engineering Services.
Storm sewer system.
Road Development.
analysis.
Scroll